Modernization

LEGACY MIGRATIONS.

Modernization that doesn't melt down in cutover. Incremental migrations, real dual-running, and the institutional patience to land an 18-month arc.

8 Paths No Big Bang
001 / 003 Migration Paths

Pick your transition.

PATH-01

.NET Framework to .NET 8 Migration | VooStack Modernization

Migrate .NET Framework 4.x to .NET 8 without a feature freeze. Incremental WebForms, WCF, and System.Web modernization from a veteran-owned SDVOSB firm.

Open file →
PATH-02

jQuery to React Migration: Incremental, SEO-Safe | VooStack

Migrate jQuery and server-rendered front ends to React incrementally — route by route, with SEO preserved and rollback intact. SDVOSB-certified consulting.

Open file →
PATH-03

Legacy Database to Postgres Migration | VooStack

Migrate Oracle, SQL Server, or DB2 to Postgres with CDC dual-running, procedure parity, and performance validation. SDVOSB-certified. No downtime weekend.

Open file →
PATH-04

Monolith to Microservices Migration | VooStack Modernization

Incremental monolith-to-microservices migration using the strangler-fig pattern. Realistic 18-36 month arcs, data ownership boundaries, and SDVOSB-eligible delivery.

Open file →
PATH-05

On-Prem to Cloud Migration Consulting | VooStack (SDVOSB)

SDVOSB-certified cloud migration consulting. Move on-prem apps to AWS, Azure, or GCP without the lift-and-shift cost trap. FinOps and FedRAMP-ready from day one.

Open file →
PATH-06

Oracle to PostgreSQL Migration Services | VooStack

Migrate from Oracle to PostgreSQL without breaking production. PL/SQL conversion, sequence handling, DMS cutover, and license cost reduction done by senior engineers.

Open file →
PATH-07

PHP to Node.js Migration | Legacy Modernization | VooStack

Migrate legacy PHP (CodeIgniter, Laravel 4-5) to Node.js route-by-route without a big-bang rewrite. Shared sessions, same DB, real cutover plans from SDVOSB engineers.

Open file →
PATH-08

WordPress to Headless Migration (Astro, Next.js) | VooStack

Migrate WordPress to a headless or static stack (Astro, Next.js) without losing rankings, redirects, or editorial workflow. SDVOSB-certified senior engineers.

Open file →
002 / 003 Strategies

Migration strategies, compared

Most legacy moves land on one of three strategies — often in sequence. Here's how they trade off.

Strategy What it means Effort Best when
Rehost (lift-and-shift) Move the system to the cloud as-is, with no code changes. Low You need out of a datacenter fast and will optimize later.
Replatform Adopt managed services (managed DB, containers) with minimal code changes. Medium You want cloud cost and ops wins without a full rewrite.
Refactor / Re-architect Restructure the code — break up the monolith, adopt cloud-native patterns. High The architecture itself is the bottleneck and has to change.
003 / 003 FAQ

Common questions

What is application modernization?

Application modernization is upgrading legacy software — old .NET Framework apps, monoliths, or on-prem systems — to modern, cloud-native architectures without losing the business logic that already works. It spans replatforming, refactoring, re-architecting, and the data migration that comes with them.

How do you modernize without a risky big-bang rewrite?

We use the strangler-fig pattern: stand up the new system beside the old one and move functionality across in small, reversible slices. The legacy app keeps serving users the whole time, so there is no flag-day cutover and no quarter-long freeze.

Can you migrate .NET Framework to modern .NET?

Yes — it is one of our core paths. We move .NET Framework workloads to current cross-platform .NET, untangle the dependencies that block the upgrade, and replatform onto managed cloud services, including AWS GovCloud or Azure Government for regulated workloads.

Will modernization break what already works?

No. We characterize current behavior with tests first, migrate in slices behind feature flags, and keep a rollback path at every step. The goal is a system that is cheaper and safer to run — not a rewrite that trades old problems for new ones.

Next step

Stack not listed?

Tell us what you're trying to retire. We respond within one business day.